Home     Site Map     हिन्दी

Government of India
Ministry of Power
Central Electricity Authority
North Eastern Regional Power Committee

 

भारत सरकार
विद्युत मंत्रालय
केन्द्रीय विद्युत प्राधिकरण
उत्तर पूर्वी क्षेत्रीय विद्युत समिति

NERPC - logo
  • Banner
  • Banner
  • Banner
  • Banner
  • Banner
HOME
Official Language Policy
Right to Information Act
Power Map of NER
CERC Orders
CERC Regulations
CEA Regulations
Archieves
Tenders
Photo Gallery
Contact Us
Feedback
Site Map

Nature

Introduction

Please use IE10 or google chrome for convenient browsing

In accordance with the Electricity Act, 2003, RPCs have been constituted by the Central Government for the specified Region(s) for facilitating the Integrated operation of the power system in the Region. The Secretariat of the RPC is headed by the Member Secretary, who is appointed by the Central Electricity Authority (CEA), together with the other staff for the RPC Secretariat. Under section 29(4) of the Electricity Act, 2003, the Regional Power Committee in the region may, from time to time, agree on matters concerning the stability and smooth operation of the integrated grid and economy and efficiency in the operation of the power system in that region.         The following functions which go to facilitate the stability and smooth operation of the systems are identified for the RPC:
  1. To undertake Regional Level operation analysis for improving grid performance.
  2. To facilitate inter-state/inter-regional transfer of power.
  3. To facilitate all functions of planning relating to inter-state/ intrastate transmission system with CTU/STU.
  4. To coordinate planning of maintenance of generating machines of various generating companies of the region including those of interstate generating companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programmed on monthly basis.
  5. To undertake planning of outage of transmission system on annual / monthly basis.
  6. To undertake operational planning studies including protection studies for stable operation of the grid.
  7. To undertake planning for maintaining proper voltages through review of reactive compensation requirement through system study committee and monitoring of installed capacitors.
  8. To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.
The decisions of RPC arrived at by consensus regarding operation of the regional grid and scheduling and despatch of electricity, if not inconsistent with the provisions of IEGC / CERC Regulations, shall be followed by the concerned RLDC/SLDC/CTU/STU and Users, subject to directions of the Central Commission, if any. Member Secretary, RPC shall, certify transmission system availability factor for regional AC and HVDC transmission systems separately for the purpose of payment of transmission charges: RPC Secretariat or any other person as notified by the Commission from time to time, shall prepare monthly Regional Energy Account (REA), weekly unscheduled interchange account, reactive energy account, and congestion charge account, based on data provided by RLDC, and renewable regulatory charge account based on data provided by SLDC/RLDC of the State/Region in which the wind generator is located and any other charges specified by the Commission for the purpose of billing and payments of various charges .

Meetings

Agenda items for Joint meeting of 96th OCC & 20th PCC to be held on 4th April'2014


Notification for Joint meeting of 96th OCC & 20th PCC


Minutes of 95th OCC & 19th PCC issued


Deferment of 21st Commercial Commiittee Meeting


Minutes of 14th TCC meeting at Agartala and minutes of 14th NERPC issued


Latest Energy Accounts

RE Account for 24.03.14 - 30.03.14 issued


Deviation Charges Account for 24.03.14 - 30.03.14 issued


RE Account for 17.03.14 - 23.03.14 issued


Deviation Charges Account for 17.03.14 - 23.03.14 issued


Regional Energy Account for March 2014 issued


RE Account for 03.03.14 - 16.03.14 (2 weeks) issued


RTA for March 2014 issued


ECR for NEEPCO and NHPC stations


General

Revised Share Allocation of NER Beneficiaries from NTPC Stations in ER due to bundling of 5MW Solar power allocation to Assam


Click here to download the format for submitting protection details (with typical example) in excel


Revised Load Generation Balance Report for 2012-2013 issued